Steel Project Index / SDS2 Reports / Drawing + Rev Register
SDS2 Report Writer template · for the PM · FREE

Drawing + Rev Register

Sheet list with revision level, date, drawn by, and approval status — plus a revision history table.

DRAWING REGISTER JOB 2412 ------------------------------------------------------ SHEET TITLE REV DATE BY STATUS E1 Anchor bolt plan 2 07/18/26 JT Approved E2 Erection plan 1 07/02/26 JT Approved B101 Beam details 3 07/29/26 JT In review ------------------------------------------------------ REV HISTORY B101: 1 06/20 issue - 2 07/11 - 3 07/29

Sample output — layout representative, numbers illustrative. Your job's data fills it.

Who it's for
The PM.
What's in it
Every detail and erection sheet · current revision level and date · drawn by · approval status · revision history per sheet.
Why it exists
Revision tracking is a named deliverable on real contracts, and approval status lives in the model — SDS2 has sheet lists and member revisions, but not the register format submittals ask for.
How it's built
Built on DetailSheet (73 fields), ErectionSheet (60 fields), and GatherSheet.RevisionLevel/ApprovalStatus.

Install — about a minute

  1. Download the template file.
  2. Drop it into your job's Job\reports\Detailing\ folder.
  3. In SDS2, run it from Run Report Writer Report.
Download — free with a free account Email sign-in, no password. Anonymous visitors can browse everything.

Verify report output against your project documents before fabrication. Templates are original SPI work built on the verified SDS2 ModelAll field catalog — every field path they use is checked against it, never guessed.

The weekly steel brief

One email. One new tool or template. Every week.

A copy-ready RFI or worksheet, a calculator or SDS2 template, and directory updates. No filler, unsubscribe anytime.